INSTALLATION OF CNG PIPING
PT. PLN Nusantara Power - UP. Gresik
$100.600
DETAILS
Pipeline Diameter
2 inch Sch.160
Lenght
300 meter
Year Built
2024
Installation of CNG Piping to connect existing CNG Plant to 40ft CNG Cylinder.
DESIGN AND BUILD JARINGAN GAS
Kawasan Industri PIER II
Gas Network Design and Build Work Jl. Kraton Industri III, PIER II Industrial Zone, Pasuruan was implemented in the context of to improve the quality and quantity of supplies infrastructure and supporting facilities in the Industrial Area PIER II is a gas network to serve tenants / investors those who need gas supplies include PT Indonesia Evergreen Pasuruan and PT Onduline Manufaktur Indonesia.
$712.600
DETAILS
Pipeline Diameter
6 inch
Lenght
3,000 meter
Total Flow
9 MMSCFD
Gas Source
Pertamina Gas Niaga
Year Built
2023
Horizontal Directional Drilling - 200 meter
PIPING ME
PT. Amerta Karya (Persero)
PIPELINE 10"
PT. Arsynergy Resources
$326.600
$593.400
STEAM TRAP
PT. Tri Sakti Purwosari Makmur
$120.000
CONTACTS
+62-31-8553205
info@sentraprima.co.id
ADDRESS
Unimas Garden Regency. Jl. Imermotors I / D.12 & B.6
Sidoarjo, Indonesia, 61256