INSTALLATION OF CNG PIPING

PT. PLN Nusantara Power - Gresik

$100.600

DETAILS

Pipeline Diameter
2 inch Sch.160

Lenght
300 meter

Year Built
2024

Installation of CNG Piping to connect existing CNG Plant to 40ft CNG Cylinder. 

DESIGN AND BUILD JARINGAN GAS

Kawasan Industri PIER II

Gas Network Design and Build Work Jl. Kraton Industri III, PIER II Industrial Zone, Pasuruan was implemented in the context of to improve the quality and quantity of supplies infrastructure and supporting facilities in the Industrial Area PIER II is a gas network to serve tenants / investors those who need gas supplies include PT Indonesia Evergreen Pasuruan and PT Onduline Manufaktur Indonesia.

$712.600

Basic Design for Pipeline Route

DETAILS

Pipeline Diameter
6 inch

Lenght
3,000 meter

Total Flow
9 MMSCFD

Gas Source
Pertamina Gas Niaga

Year Built
2023

PIPING ME

PT. Amerta Karya (Persero)

PIPELINE 10"

PT. Arsynergy Resources

$326.600

$593.400

STEAM TRAP

PT. Tri Sakti Purwosari Makmur

$120.000